Vibration foundation with FAEBI®

Bilz scope of supply and services
8 x Bilz FAEBI® 580 HD with mechanical-pneumatic level control MPN-LCV
Planning services

  • Creation of the foundation
  • Static calculations
  • Formwork and reinforcement plans
  • Steel and steel bending schedule

Requirements

  • A maximum of 3 weeks loss of production.
  • Special shape 5 corner
  • Tight space conditions and entry to the inspection channel through the foundation block
  • Extremely small allowable horizontal movements of the machine
  • Reliable source isolation for suppressing the disturbing vibrations in the adjacent building, 2. floor, from 10 Hz.

CORPORATE OFFICE

D-1/18, M.I.D.C, Ambad, Nashik-422010, India